Project description

Experience a skyline-altering wonder at Netaji Subhash Place (NSP), an iconic address blending world-class office spaces, premium retail, and soulful entertainment.

Bestfield is a 1.2 million sq. ft. landmark development designed to redefine the commercial landscape of North West Delhi. Situated in the heart of Netaji Subhash Place, this project serves as a “Hub of Splendor,” where communities come together to work, play, and rejuvenate. With state-of-the-art infrastructure and a massive central waterfront, Bestfield is the premier destination for global brands and budding entrepreneurs alike.

Key Details

Features & amenities

24x7 Security

On-ground security personnel ensuring a safe and hygienic environment

Surveillance System

CCTV and monitoring systems integrated throughout the 1.2 million sq. ft

Fitness Center

Exclusive access to the Executive Rooftop Club and serene outdoor spaces.

Entertainment & play area

Over 70,000+ sq. ft. of dedicated indoor and outdoor entertainment zones

24 hour maintenance

Dedicated facility management team ensuring all common areas, washrooms, and high-speed elevators operate

The Waterfront

A unique 50,000 sq. ft. aquatic landscape where you can relax by the water, grab a meal, and unwind from the city hustle.

Firefighting System

Advanced, building-wide fire detection and suppression infrastructure.

Landscape Garden

Architecturally designed greenery and artistic engineering that surrounds the Work field offices and retail boutiques.

Location

address
Netaji Subhash Place (NSP), North West Delhi
Key Details

Business Density: Home to 50+ high-rise buildings and 10,000+ operational offices.

Connectivity: Seamlessly connected via Delhi Metro and major flyovers.

Catchment: Surrounded by some of the richest residential catchment areas in North West Delhi.